FARASAN PS CONTROL SYSTEM
• Main Contractor: Future Controls Co.
• Owner. General directorate or water = Jazan
• Scope: Design, supply, install, Test & Commissioning and link to SCADA the operation & controls of the pumping stations in 4 Sites
FARASAN PS CONTROL SYSTEM
• Main Contractor: Future Controls Co.
• Owner. General directorate or water = Jazan
• Scope: Design, supply, install, Test & Commissioning and link to SCADA the operation & controls of the pumping stations in 4 Sites